PASS P&S Mission Scheduling Support
for UPS/NCC'98

Systems Engineering Analysis:
  • HST/NCC Communications Scheduling Overview

  • HST Communications Requirements (htm, pdf)

  • HST UPS/NCC Communications Operational Flow

  • HST Communications Scheduling via PASS MS/UPS'98:

    • Flexible Scheduling Data Flow (pdf)

    • HST UPS/NCC'98 Communications Scheduling Data

    • UPS'98 Prototype Events and HST Communications Requirements

    • TDRS Scheduling Windows

    • HST Communications Scheduling Diagram (pdf, txt)

    • HST Respecifiable Service Communications Parameters
PASS MS Software Modifications Supporting
UPS/NCC'98 - Related PRs:
  • 29562 - Delete science downlink timeline
  • 29778 - Remove iterative NCC schedule mode
  • 29214, 29260 - Assign correct configuration code to SSAR playback service
  • 29563 - Delete .GCM file
  • 34706 - Automate TDRS schedule updates
  • 36050 - Replace COMDRV transmission of schedules to UPS
  • 36842 - Modify commanding times for MA/SSA transmitters
  • 37387 - Fix engineering record all mode and SMS tape dump
  • 37388 - Fix missing forward for SSAR
  • TBD - Provide HST antenna view periods to UPS
  • TBD - Use UPS/NCC'98 flexible scheduling


Related Links:


Return to SSCB homepage


Last updated 8 August 2002
This page maintained by John Kucel