PASS Port to UNIX

Studies:

Presentations:

  • Migration tools (STScI S/W Workshop, 3/13/01) (pdf)
  • Solar-lunar-planetary ephemeris package
        o   STScI S/W Workshop (3/13/01) (pdf)
        o   17th Int'l Symposium on Space Flight Dynamics
              (6/16-20/03):  Paper (pdf), Slides (pdf)

Prototypes (completed 2/01):

Schedules:

Porting Aids:

  • Coding issues (pdf)
  • Port checklist (pdf)
  • Using file resolver (pdf)
  • ISAM Fortran interface (pdf)
  • F77 I/O error codes on Solaris (pdf)
Implementation:

Integration Testing:

  • CCS product list (pdf)
  • Product transfer meetings
        o   7/03:  minutes (pdf), handout (pdf),
        o   9/24:  minutes (txt), handouts: development (pdf), CCS (pdf),
             FOT (pdf)
        o   11/6:  minutes (txt), handouts: development (pdf), CCS (pdf)
  • Product transfer test results/status (pdf)
  • SMS reviews
  • MEGG ops testing (pdf)

Flight Operations (completed 1/04):

  • Transition plan (11/13/03)
         o    Parallel ops plan (pdf)
         o    Transition calendar (pdf)
         o    Checklist (pdf)
  • Ground System Readiness Review (12/10/03) (pdf)
  • Current transition calendars (12/24/03)
         o    December (pdf)
         o    January (pdf)
  • Parallel ops HSTAR/TSAR summary (pdf)
  • MOSES/CCS parallel operations status

Return to PASS homepage


Last updated January 24, 2006