| Studies:
Presentations:
- Migration tools (STScI S/W Workshop, 3/13/01) (pdf)
- Solar-lunar-planetary ephemeris package
o STScI S/W Workshop (3/13/01) (pdf)
o 17th Int'l Symposium on Space Flight Dynamics
(6/16-20/03): Paper (pdf), Slides (pdf)
Prototypes (completed 2/01):
Schedules:
- Port schedule: 5/03 (pdf), 12/02 (pdf), 6/01 (pdf)
- Build/release plan (pdf)
- Status: 1/04 (pdf, ppt), 6/03 (pdf, ppt), 5/03 (pdf, ppt),
9/02 (pdf, ppt),
6/02 (pdf), 6/01 (pdf),
2/01 (txt), 3/00 (txt)
Porting Aids:
- Coding issues (pdf)
- Port checklist (pdf)
- Using file resolver (pdf)
- ISAM Fortran interface (pdf)
- F77 I/O error codes on Solaris (pdf)
|
|
Implementation:
Integration Testing:
- CCS product list (pdf)
- Product transfer meetings
o 7/03: minutes (pdf), handout (pdf),
o 9/24: minutes (txt), handouts: development
(pdf), CCS (pdf),
FOT (pdf)
o 11/6: minutes (txt), handouts: development
(pdf), CCS (pdf)
- Product transfer test results/status (pdf)
- SMS reviews
- MEGG ops testing (pdf)
Flight Operations (completed 1/04):
- Transition plan (11/13/03)
o Parallel ops plan (pdf)
o Transition calendar (pdf)
o Checklist (pdf)
- Ground System Readiness Review (12/10/03) (pdf)
- Current transition calendars (12/24/03)
o December (pdf)
o January (pdf)
- Parallel ops HSTAR/TSAR summary (pdf)
- MOSES/CCS
parallel operations status
|